In case we have not met, I’m Alexa Williams, Ask Alexa. I have worked here at Etelux for almost 15 years establishing great relationships with our customers and partners. Throughout my career at Etelux, I have had the pleasure of advocating for you, the customer, to make sure that you are taken care of. Most of the time, I am the friendly voice that answers the corporate phone line, so if we have not met in person, I’m sure we have talked. This form is to reach me directly, and I will respond as soon as I can. You can ask me anything, such as questions about our enclosures, help with which replacement parts to order, certification questions, etc…
Etelux is a global leader in the manufacture and design of glove box technology products.
Serving the Chinese scientific industry for over 15 years, discover how quality products, competitive pricing, and next day delivery allow us to achieve our mission “Enabling Technology for a Better World ".
Ultricies eu consectetur vitae donec scelerisque ante a ut morbi aptent tincidunt est non sagittis ut.
The vacuum pump should be kept on during system operation.
When the oxygen concentration in the chamber exceeds 200PPM, the equipment maintenance personnel should be notified to perform system operation, otherwise the H2O and O2 purification system will be damaged.
Do a check before starting the cycle to see if it is in a chamber condition or regeneration. As the operation mentioned above is in progress, it is absolutely forbidden to perform the circle.
Two purification columns cannot be regenerated at the same time.
Before regeneration, make sure that the glove box has been cleaned by inert gas (H2O <200ppm) to ensure sufficient regeneration gas supply. The regeneration gas pressure is 0.06-0.08 mpa.
Before starting regeneration, please make sure that the corresponding purification column cycle is closed.
The regeneration process takes 24 hours. Once it can’t be disconnected, the regeneration gas should be used 3-6 hours after the regeneration starts. Pay attention to the amount of regeneration gas, adjust the pressure of the regeneration gas appropriately, and ensure the sufficient supply of regeneration gas in these 3 hours. The origin of regeneration can be turned off after 6 hours.
The vacuum pump cannot be turned off during regeneration. Do not touch the top of the purification column to prevent burns.
Once the regeneration is terminated unexpectedly, please ensure that the regeneration and circulation of the purification column cannot be restarted within 12 hours, otherwise the equipment will be damaged.
Protect the working gloves from damage during operation.